Skip to main content
contact@eapaint.com(508) 466-5846

Exterior painting

What exterior painting actually costs — and why nobody can quote it over the phone

Two houses the same size on the same street can be priced very differently, and both prices can be fair. Here is what actually moves the number, and how to tell a real estimate from a guess.

A stained deck and railing meeting cream clapboard siding in Chelmsford, MA

Free estimate

Tell us what the house needs

Written, itemized, fixed price — usually within two business days of the visit.

What happens next

  1. 01A real estimate, in writing
  2. 02Protection and prep
  3. 03Paint, two full coats
  4. 04Walkthrough before we invoice

Prefer the phone? Call (508) 466-5846

By EA Paint & Light Carpentry5 min read

Two painters working on the trim and shutters of a brick townhouse

At a glance

Adds most timeAverage
Scraping, priming and rot repair
Also adds timeAverage
Height, trim detail, lead-safe work
Biggest driver
Labor, mostly prep; not the paint
Compare bids
Scope first, then the totals

Times are rough averages for planning only. Every house is different — size, condition, repairs and weather all change it. Your written estimate gives the actual schedule for your job.

What determines the cost of painting a house exterior?

Mostly labor, and labor is set by condition more than size: how much scraping, priming and caulking the surfaces need, how much rotted wood must be replaced first, the siding type, the height and access, the amount of trim and detail, and whether lead-safe practices are required on a pre-1978 house. Paint is usually the smaller share.

Why a phone quote is a guess

Square footage tells a painter how much wall there is. It does not say how much of the old paint is failing, whether the trim is sound, how many windows there are, or whether the back of the house is a ladder job or needs staging. Those are the things that decide how many days the job takes, and days are most of the price.

A number given over the phone has to be either padded to cover what the painter cannot see, or low and followed by change orders once the ladders are up. Neither is a good deal for the homeowner.

The factors that move the price

Roughly in order of how much they usually matter:

  • Condition of the existing paint — light washing and spot-scraping is a very different job from scraping a whole house back to sound paint
  • Rotted or damaged wood — sills, trim and clapboard that need replacing before anything is painted
  • Siding type — clapboard, cedar shingle, vinyl and fiber cement each prep and paint differently; bare or weathered shingles absorb far more primer and paint
  • Height and access — a single-story ranch is a ladder job; a three-story colonial or a steep lot may need staging or a lift
  • Trim and detail — the number of windows, shutters, brackets and porch railings, which are slow, hand-brushed work
  • Lead-safe work on pre-1978 houses — containment, careful scraping and daily cleanup add time, and are not optional
  • Number of coats and color change — a big color change or a very dark color can mean primer plus two finish coats
  • Paint grade — better paint costs more per gallon but is a small part of the total, and usually the cheapest part of the job to upgrade

Each factor, and what to ask about it

The same factors as a checklist you can take into an estimate visit.

  • Paint condition

    Why it changes the time
    Scraping and sanding failing paint is slow, careful work
    What to ask
    How much will be scraped, and to what standard?
  • Rotted wood

    Why it changes the time
    Each repair is cut, fitted, primed and painted
    What to ask
    Which boards are being replaced, and is each one priced?
  • Siding type

    Why it changes the time
    Shingles and weathered wood take more primer and paint
    What to ask
    What primer goes on bare or weathered wood?
  • Height and access

    Why it changes the time
    Staging or a lift takes time to set up and move
    What to ask
    Ladders, staging or a lift — and who protects the plantings?
  • Trim and detail

    Why it changes the time
    Windows, brackets and railings are brushed by hand
    What to ask
    Are shutters, doors and porch ceilings included?
  • Lead-safe work

    Why it changes the time
    Containment and daily cleanup add hours
    What to ask
    What lead-safe practices will you use on this house?

Why Massachusetts houses vary so much

Two neighbouring towns can have very different housing stock, and that changes what an exterior job involves. In Worcester the median home was built around 1951 and about 77% of homes were built before 1980 — more layers of old paint, more wood trim and more lead-safe work. In Northborough the median is 1980, so a typical job is more often a repaint on a house with fewer layers to deal with.

Neither is better or worse; they are simply different jobs, which is why a price that was right for a friend’s house in one town tells you little about yours in another.

Tip: If two bids differ a lot, ask each contractor to walk you through how many days the job takes and what happens on each. The difference is almost always in the prep.

Where the money actually goes

On a typical exterior, labor is the large majority of the price and materials are the smaller share. Within the labor, preparation — washing, scraping, sanding, priming bare wood, caulking and repair — is usually more of the time than the finish coats. That is why two estimates with very different prices are often describing two very different amounts of prep.

How to read an estimate

A real estimate is written after someone has walked the house, and it says what will be done, not only what it costs. Look for:

  • Which surfaces are included — body, trim, doors, shutters, porch ceilings, foundation
  • How the prep is described — washing, scraping, priming bare wood, caulking
  • Carpentry listed and priced separately, by item, so you can see what the rot repair costs
  • The products and the number of coats
  • Whether the price is fixed, and what happens if something unexpected turns up behind a board
  • Proof of insurance, and the company’s registration with the Commonwealth

Comparing bids fairly

Put the estimates side by side and compare the scope before the totals. If one bid does not mention the soft sills you found with a screwdriver, or says nothing about priming, it is not cheaper — it is a different job. Ask each contractor the same questions, and ask the low bidder what they left out.

Talk to a local crew

EA Paint & Light Carpentry is a painting and light carpentry company based in Northborough, MA. If you would like the house looked at, call (508) 466-5846 or request a free written estimate. Related services: Exterior Painting, Light Carpentry & Wood Repair.

Keep reading

Guides that go with this one

Exterior painting5 min read

When to paint your house in Massachusetts: the real season

The exterior season here runs from late spring to mid-fall, but the calendar is only half of it. Surface temperature, dew and the hours paint needs to dry decide which days actually work.

Read the guide

Exterior painting7 min read

How long does exterior paint last on a New England house?

A good exterior paint job lasts years, not decades, and not every part of the house wears at the same rate. Here is what to expect surface by surface, and what quietly shortens the clock.

Lasts (average): About 7–10 years on painted clapboard

Read the guide

Questions

Common questions

Why do exterior painting estimates vary so much?

Because they often describe different jobs. The biggest variable is preparation — how much scraping, priming, caulking and rot repair is included — followed by access and the amount of trim. Compare what each estimate says will be done before comparing the totals.

Does an older house cost more to paint?

Often, yes. Older houses tend to have more layers of failing paint, more trim and detail, more wood that needs repair, and — on houses built before 1978 — lead-safe work practices that add time for containment and cleanup.

Is a free estimate really free?

It should be. A painting estimate is a site visit, a walk around the house and a written scope and price, with no obligation. If a contractor wants a fee to tell you what the job costs, ask what you are getting for it.

Still have a question? Ask it on the phone — you will get a straight answer.

Get a free, written estimate

Edio Aguiar comes out, looks at the actual surfaces, and puts a fixed itemized price in writing. No obligation, no sales pitch, no phone quote guessed from a photo.